Inputs

12 parameters · live recalculation on every change

L
10L 200L default 10000L
MS/CM
0.5mS/cm 1.8mS/cm default 4mS/cm
$/L
0.01$/L 0.05$/L default 1$/L
$/L
0$/L 0.001$/L default 0.1$/L
DAYS
30days 90days default 365days
ⓘ Basis of calculation How it’s computed
1

Enter the reservoir volume, EC target and price per liter — nutrient liters = V × EC × concentration factor × (1 + waste/100).

2

Let evaporation compound across the cycle and apply the recycling rate: make-up water = V × (1 + evap × days/100) × (1 − recycling/100).

3

Build the mix bill: nutrient liters × price, water liters × water cost, plus pH adjustment on the standing volume.

4

Apply the bulk discount off the mix bill and the 80% recycling recovery credit to get bulk savings and recycling savings.

5

Add labor as a real undiscounted line, subtract total savings from the mix bill, then divide by volume and days for cost per liter and cost per day.

6

Read the verdict off savings % (of mix cost) and net cost per liter — green above 20% savings, red under 10% or past $0.25/L.

Live output

Total Cost / Cycle

Live
$28.94

Total Cost / Cycle

Savings strong Cost/L low
Bulk and recycling recover 60% of the mix bill and net holds at $0.145 per liter — the program is paying for itself.
Cost / Liter $0.145 $/L
Bulk Savings $4.47 $
Recycling Savings $8.94 $
Total Savings $13.41 $
Cost / Day 0.3 $/day
Nutrient Solution 396.0 L
Make-Up Water 550.0 L
Mode cost Active profile
Nutrient Cost Optimizer Powered by MistCulture Full Nutrient Cost Optimizer · All tools