Inputs

12 parameters · live recalculation on every change

M²
1m² 50m² default 1000m²
/DAY
1/day 4/day default 24/day
L/H
0.5L/h 2L/h default 20L/h
ⓘ Basis of calculation How it’s computed
1

Pick the medium and the stage: field capacity by substrate — coco 75%, rockwool 80%, soil 45%, perlite 35%, clay 50% — decides the water bank the dryback rolls against.

2

Set the dryback target: the percent of that bank you want transpired between events, 10–30% for the working band, higher with higher EC for generative steering.

3

Compute irrigation time: substrate litres × dryback ÷ (flow L/h ÷ 60 × emitters), scaled by stage (seedling 0.5, veg 0.8, flower 1.0, fruit 1.2), VPD factor and root heat (+2% per °C over 20).

4

Adjust events per day: base frequency × VPD × (1 + 0.05(T − 20)) — a dry hot room waters more often without a manual change.

5

Close the loop on runoff and moisture: runoff = (shot − substrate × (1 − dryback) × FC) ÷ shot; moisture = 100 − dryback actual — no drainage means every fed ion stays in the pot.

6

Read the safety band: dryback 10–30 %, runoff 15–25 %, moisture 50–75 % green; the red edges are dryback <5 or >45, runoff <10 or >35, moisture <40 or >85 — and the EC drift line tells you what no-runoff is really costing.

Live output

Irrigation Time

Live
6.0 min

Irrigation Time

6.0 min · 4.0/day · 2.00 L/shot · 0% runoff · 20% dryback · 80% moisture · RED · runoff 0.0% outside 10–35 · moisture off 50–75%
Events / Day 4.0 /day
Runoff Actual 0 %
Dryback Actual 20 %
Water / Day 8.0 L
Substrate Moisture 80 %
VPD-Adjusted Freq 4.0 /day
EC Drift 0.18 mS/day
Mode timer Active profile
Irrigation Timer Calculator — Drip, Schedule & Dryback Blueprint Powered by MistCulture Full Irrigation Timer Calculator — Drip, Schedule & Dryback Blueprint · All tools